
Project Description
Little Reddings Primary School in Bushey marks a significant milestone with the successful completion of its comprehensive groundworks package. This project transformed the site into a fully functional modern learning environment, featuring essential external infrastructure. From constructing a new car park to delivering the MUGA pitch with precise groundwork and levels, every element was meticulously planned.
The inclusion of a sustainable swale system for surface water drainage ensures long-term environmental resilience, while integrated foul and surface drainage, complete with manholes, ACOs, and flow control devices, supports efficient water management. Trenching for utilities, foundations for cycle stores and bollards, plus paving, kerbing, tree pits, and landscaping groundwork, all contribute to a safe, accessible, and aesthetically pleasing school campus.
Our Scope of Work
Cosman Assist delivered a full spectrum of groundworks expertise tailored to the unique needs of Little Reddings Primary School. Key deliverables included the construction and preparation of the new car park, ensuring ample parking for staff, visitors, and parents. The MUGA pitch was expertly formed with groundwork build-up and accurate levels for optimal playability.
Sustainable features like the swale system addressed surface water drainage effectively, complemented by the installation of remaining foul and surface drainage infrastructure, including essential components such as manholes, ACOs, and flow control devices. Additional works encompassed trenching and ductwork for incoming utilities, robust foundations and slabs for external features like cycle stores and bollards, and finishing touches with paving, kerbing, tree pits, and associated landscaping groundwork. This holistic approach guaranteed a seamless integration of all site elements.


Project Achievements
This collaborative triumph with the Morgan Sindall team underscores Cosman Assist’s commitment to safe, high-quality groundwork solutions. The project not only met but exceeded expectations, providing durable infrastructure that enhances the school’s long-term usability and sustainability. Proud site teams executed every phase with precision, fostering a secure environment for future generations of students.
Special recognition goes to the unwavering trust and teamwork from Morgan Sindall, which propelled the initiative to completion. Little Reddings Primary School now stands as a testament to innovative civil engineering, blending functionality with eco-conscious design for an inspiring educational space.





